CARI Infonet

 Forgot password?
 Register

ADVERTISEMENT

12Next
Return to list New
View: 2875|Reply: 21

[Dunia] Najib gigit jari sambil ketap bibir, HSR akan dibatalkan

  [Copy link]
Post time 28-5-2018 07:33 PM From the mobile phone | Show all posts |Read mode
KUALA LUMPUR: Malaysia plans to drop its plans for a high-speed rail link between its capital, Kuala Lumpur, and Singapore, and will talk with its southern neighbour about the pact to build it, Prime Minister Tun Dr Mahathir Mohamad said in an interview published on Monday.

"We need to do away with some of the unnecessary projects, for example the high-speed rail, which is going to cost us RM110bn ($28bn) and will not earn us a single cent. That will be dropped," Mahathir told the Financial Times.

"We have an agreement with Singapore. We have to talk with Singapore about dropping that project," he said, according to Reuters.

When Pakatan Harapan swept to power in the 14th General Elections on May 9, it announced that it would review mega projects initiated by the previous administration to save the country billions of ringgit.

These may include the HSR, Bandar Malaysia, Tun Razak Exchange (TRX) and the Pan-Borneo Highway.

The HSR is a 350-km railway scheme linking Kuala Lumpur and Singapore and is expected to start operations from 2026.

Interestingly, two days before the Dewan Rakyat was dissolved in April to pave way for the 14th general election, MyHSR Corp Sdn Bhd – the firm responsible for the development and implementation of the project – announced the appointment  of two project delivery partners (PDPs) for the project to oversee the civil works worth a combined RM30bil-RM40bil.
Read more at https://www.thestar.com.my/business

....Macai nangis kt bucu katil x dpt naik ketapi laju KL-Spore
Reply

Use magic Report


ADVERTISEMENT


Post time 28-5-2018 07:47 PM | Show all posts
duit komisen HSR pun dah abih kena hangkut dek panglima Benggali
Reply

Use magic Report

 Author| Post time 28-5-2018 07:50 PM From the mobile phone | Show all posts
"The terms and agreement for the HSR are such that if we decide to drop the project, it would cost us a lot of money," he said.

"We have entered into an agreement with Singapore. If we break the agreement, we have to pay a very large sum of money."

The HSR is estimated to cost up to RM50 billion, and will slash the travelling time between Singapore and Kuala Lumpur to 90 minutes when completed in 2026.

Most of the line - 335km of it - will be in Malaysia, with the remaining 15km in Singapore. The HSR will have eight stops - seven in Malaysia and one in Jurong East.

The Land Transport Authority called for tenders for the design and construction of tunnels and associated facilities for Singapore's end of the HSR last month, with construction expected to start next year.
Reply

Use magic Report

Post time 28-5-2018 08:10 PM From the mobile phone | Show all posts
Menteri kabinet zaman najib semua kayu. Dakwa dorang semua atas alasan merugikn duit negara.
Reply

Use magic Report

Post time 28-5-2018 08:15 PM | Show all posts
dekat sini jer dah dapat jimat lebih 100 billion fuh..Najib nie buat kerja x der faedah jer dia reti
Reply

Use magic Report

Post time 28-5-2018 09:45 PM From the mobile phone | Show all posts
Ganti dgn projek lrt kat jb dgn penang lg bagus..semua golongan rakyat dpt faedah
Reply

Use magic Report

Follow Us
Post time 28-5-2018 09:56 PM From the mobile phone | Show all posts
wunan88 replied at 28-5-2018 08:15 PM
dekat sini jer dah dapat jimat lebih 100 billion fuh..Najib nie buat kerja x der faedah jer dia reti

introducer dpt 20%..dr 110billion introducer dpt 22 billion...

cari siapa introducer
Reply

Use magic Report

Post time 28-5-2018 09:59 PM From the mobile phone | Show all posts
kecimpret replied at 28-5-2018 09:45 PM
Ganti dgn projek lrt kat jb dgn penang lg bagus..semua golongan rakyat dpt faedah

buat penambahan sedia ada trail keretapi mcm ets ke pantai timur pun bagus...tak perlu nak beli tanah utk pembinaan landasan baru
Reply

Use magic Report


ADVERTISEMENT


Post time 28-5-2018 10:04 PM From the mobile phone | Show all posts
Naik ketapi senadung malam cukup.. xyah nak bullet train ni sume.. ke arah negara maju wawasan 2020..
Reply

Use magic Report

Post time 28-5-2018 10:06 PM From the mobile phone | Show all posts
Pan Borneo pun affected ka?
Reply

Use magic Report

Post time 28-5-2018 10:37 PM From the mobile phone | Show all posts
Projek2 gini la geng najib suka..ratus juta boleh masuk tiap poket yg lapar duit negara
Reply

Use magic Report

Post time 29-5-2018 03:11 AM | Show all posts

Di Yahoo news rata rata mat salleh California sokong tindakan Tun. Depa suruh our Govenor Jerry Brown ikut tindakan Tun M.
Reply

Use magic Report

Post time 29-5-2018 03:51 AM From the mobile phone | Show all posts
Ni lah antara taik peninggalan  Jibun
Reply

Use magic Report

Post time 29-5-2018 03:59 AM From the mobile phone | Show all posts
Dengan pembatalan ini, China komunis ateis junjungan Umno jadi makin ketaq pala lutot pala bana semua
Reply

Use magic Report

Post time 29-5-2018 04:13 AM From the mobile phone | Show all posts
Rm110,000,000,000÷350km =Rm314,285,714...

Ayo yo 1km kos dia roughly Rm314 juta....blh buat berapa sekolah bantu beribu student ni
Reply

Use magic Report

Post time 29-5-2018 10:50 AM From the mobile phone | Show all posts
Gila apa 350 km jah smpai 100b! Bangkai mana yg luluskan tuh?!!
Reply

Use magic Report


ADVERTISEMENT


Post time 29-5-2018 02:12 PM From the mobile phone | Show all posts
Apa maksud will not earn us a single sen
Reply

Use magic Report

Post time 29-5-2018 02:13 PM From the mobile phone | Show all posts
RM110 b is a lot of money
Reply

Use magic Report

Post time 29-5-2018 02:21 PM From the mobile phone | Show all posts
kalo projek ni jln..sporean pling untung. da xyah memandu msuk sni..xyah isi minyak..x perlu baya levi kenderaan..jimat x bayo tol bgai.  law hsr x jdi, rs sporean akn stop msk mesia ke? x pnye.
Reply

Use magic Report

Post time 29-5-2018 02:26 PM | Show all posts
its ok rm500mil lebur daripada tanggung hutang berbilion2 utk kos projek ini..harap2 cancel.
Reply

Use magic Report

12Next
Return to list New
You have to log in before you can reply Login | Register

Points Rules

 

ADVERTISEMENT



 

ADVERTISEMENT


 


ADVERTISEMENT
Follow Us

ADVERTISEMENT


Mobile|Archiver|Mobile*default|About Us|CARI Infonet

29-3-2024 06:30 PM GMT+8 , Processed in 0.072460 second(s), 46 queries .

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

Quick Reply To Top Return to the list